Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Supported Web Browsers

  • Microsoft Edge
  • Firefox (latest)
  • Chrome (latest)
  • Internet Explorer 11

 

 

 

 

 

 

 

Section
Column

ProTrack Warehouse 2018.1.6


Fixes and Updates

  • Corrected an issue on the Daily Inquiry where deleted breaks would still be shown in the time summaries for breaks.
  • Correct a database upgrade script that could result in an error.
  • Fixed an issue where work schedules that had been shortened were not correctly removing breaks and lunches that should have been automatically removed based on the schedule.
  • Fixed an issue where the Start of Day could be deleted while there were still other assignments in the work schedule.
  • Security updates.

 

ProTrack Warehouse 2018.1.5


Fixes and Updates

  • Removed a dependency on having a task line 1 to correctly distribute standard time among child assignments.
  • Added the ability to transfer assignments in ERR status on the Daily Inquiry.
  • Fixed an issue that caused assignments to remain in MKD status.

ProTrack Warehouse 2018.1.4


Fixes and Updates

  • Fixed an issue on the Workbenches team performance widget where the time was not being used to filter the results.
  • Fixed an issue where imports could remain in VRF status.

ProTrack Warehouse 2018.1.3


Fixes and Updates

  • Fixed an issue where work schedules would not be created if the only assignment received was a delay.
  • Corrected an issue where the end time could be very long.
  • Adjusted the handling of time ranges on the workbench daily widgets.
  • Fixed the raw standard time calculation for Start of Day and End of Day assignments.

ProTrack Warehouse 2018.1.2


Enhancements

  • Added the option 'Both' to the employee configuration of kiosk filtering. Previously, standard or indirect activities could be filtered with an activity group. Now both can be filtered based on an activity group.
  • Added the new status VRF (verified) to the WMS Import Monitor screen. VRF implies that the data is correctly formatted and validated against required fields in ProTrack prior to being loaded as an assignment.

Fixes and Updates

  • Fixed an issue where the microzone field would not save correctly on the KVI entry screen.
  • Fixed an issue on the group delay screen which prevented employees on a facility default schedule from being displayed in the search results.
  • Fixed the raw standard time applied to Start of Day and End of Day assignments.

ProTrack Warehouse 2018.1.1


Fixes and Updates

  • Corrected learning curve application when used with activity zones.
  • Fixed the slotting of breaks when an adjustment is made in a split assignment.
  • Fixed an issue where the End of Day assignment would not stretch to the end of the schedule time.

ProTrack Warehouse 2018.1


Summary

This release introduces new and improved Schedule screens, allowing the user to create a more generic schedule for multiple employee requiring minimal maintenance. The new screens will allow the user to configure the schedule by defining how long the work day and which activities to apply and when. User will also be able to set a default schedule at the facility level, this will automatically be applied for any employee missing a schedule assignment but sending data into ProTrack. This will reduce the number of WMS Import errors that users will need to correct on a daily basis.

With this new change, the Workbench has also seen an upgrade. Allowing the user to see and change the date and hour range of data displayed in the Workbench. They will also be able to filter data based on the activity, department, shift, supervisor or all of the above. This will allow a clearer understanding of the data being displayed and greater control depending on the level of data the user needs to see.

Enhancements and Updates

Facility

  • A drop down will now be present allowing the user to configure a Default Schedule, only active schedules will display.

Shift

  • Shifts will now be configured by a time range, ProTrack will allow the shifts to overlap.

 

Schedule Type

  • This is a new screen, used to configure Schedule Type name, duration, and max duration.

Schedule

  • This will take place of the existing Schedule Group screen. An employee assigned to a schedule here will override the schedule assigned at the facility level. 
     

Employee

  • The Schedule tab will now display Schedule information, displaying only active schedules in the drop down list. 

Activity

  • TA Activity Code will now be configured in the Activity Configuration screen. 

Time Clock

  • Time Clock will be redesigned to allow multiple break and lunch punches

Workbench

  • A criteria section will now be present allowing the user to select activities, shift, supervisors, or department to filter data into the Workbench. By default the criteria section will be collapsed.