Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Type the Shift Name.
  2. Select the facility name from the drop down list.
  3. Type any Shift Descriptions in the text area.

    image
    imageNew Shift.jpg
    titleFig.116 Maintain Shifts - Add New Shift


  4. Click Assign Schedule tab.

    image
    imageShift Assign Sch.jpg
    titleFig.117 Maintain Shifts - Assign Schedules


  5. Click the 'Select Schedules' and a popup window appears listing all the schedules.

    image
    imageShift Select Sch.jpg
    titleFig.118 Maintain Shifts - Selecting Schedules


  6. Search for the appropriate schedule(s) by providing the schedule name or facility. The corresponding schedules are listed.

    image
    imageShift Sch List.jpg
    titleFig.119 Maintain Shifts - Schedules List


  7. Select the check box of each schedule you want to associate to the shift.
    Tip
    titleTip
    • To select all the schedules in the 'Search Results', select the Select check box and all the schedules are selected.

  8. Click to assign the selected schedules to the shift. The selected schedules are listed in the 'Shift Schedules' list in the Maintain Shift screen.

    image
    imageShift Add Sch.jpg
    titleFig.120 Maintain Shifts - Add Schedules


    Tip
    titleTip
    • If you do not want to save a Schedule associated to a shift, select the Delete check box of the corresponding Schedules and click on Save.

  9. Click to save the Shift.

...

  1. Search and list the Shifts you want to view and edit in the 'Shift Search Results' section by providing a search criteria.
  2. Click shift name link from the 'Shift Search Results' section to edit a particular shift. The details of the selected shift appear in the corresponding fields in the Maintain Shifts screen.

    image
    imageShift View.jpg
    titleFig.122 Maintain Shifts - View Shift


  3. Change the required fields.
    Info
    titleInfo
    • The field Shift Description is editable and but the Shift Name field is not.
    • The Facility list is not available if schedules are associated with the shift.

  4. To assign schedules to the existing shift, click the Assign Schedule Tab. (Refer Add Schedules for information on assigning schedules).
  5. To delete schedules assigned to the shift, select the check box of each schedule and click the button.
  6. Click to save the changes.
    Info
    titleInfo
    • If you have made the changes in the fields and do not want to save the details, click Reset before you save the changes.
    • If you want to add a shift, click Add to clear the fields and to bring the screen to add mode.