Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

CURRENT VERSION

...

2015.1

...

, PRIOR RELEASE: 

...

2014.

...

1
 

Supported Web Browsers
  • Internet Explorer 9.0 and later
  • Firefox 10.0 and later

 

...

...

  • Updated Dashboard Header to include navigation to different levels of data
    Image Removed
    • Each has Performance, Analytics, and Volumetrics dashboards with the data at that particular level:
      • Corporate
      • Business Unit
      • Region
      • Facility
      • Tasking Group
      • Activity Group
      • Activity
    • Updated look and feel for cleaner differentiation between levels
      • Level that is currently being viewed is highlighted in blue
      • Other levels not being viewed are in gray
      • Date range can be modified from the header
  • Added filters to make it easier to narrow down the data being viewed, both at the data levels and date range
  • Added the following new dashboard components
  • Revised components
Facility
  • Added the ability to configure target metrics
    • Productivity
    • Utilization
    • Total Performance is then calculated
  • Added the ability to configure baseline time frame
    • Enter a start date
    • Enter a time period in weeks from the start date
    • Can use actual wage rates, but also fall back on an defined average
  • Savings is calculated from the difference between baseline metrics and current period metrics
    • Savings is captured on a daily basis and stored in the database with associated metadata
    • Calculations as follows:
      • Paid Hours = Total Hours - Break/Lunch Hours
      • Baseline Hours = (Current Period Standard Hours) / (Baseline Utilization * (Baseline Productivity + 1))
      • Target Hours = (Current Period Standard Hours) / (Target Utilization * (Target Productivity + 1))
      • Average Wage Rate = (Paid Hours * Wage Rate) / (Sum(Paid Hours))
      • Savings = (Baseline Hours - Paid Hours) X Average Wage Rate
      • Lost Savings = (Paid Hours - Target Hours) X Average Wage Rate
      • Cumulative Savings is the sum of all savings up to the current period
      • Cumulative Lost Savings is the sum of all lost savings up to the current periodImage Removed

 

Region
  • Added the ability to add regions to ProTrack
  • Can select facilities to be a part of regions
  • Can be used on the Dashboard for filtering and groupings

 

Business Unit
  • Added the ability to add business units to ProTrack

  • Can select regions to be a part of business units

  • Can be used on the Dashboard for filtering and groupings

     

Updates to Existing Functionality

Facility Layout
  • Updated the Caching tab to allow purging of nodes for the selected floor (the same floor that will generate the node cache)
Employee
  • Fixed an issue where the status of an employee couldn't be updated on the Work Info tab of the Employee screen
    • Before saving an existing employee, the employee status sent from the UI was reset with the value in the system
    • This was causing the new status selected by user to be lost
    • The code to reset the status with the system status in the database was removed
  • Fixed an issue where employees were unable to be deleted
    • The delete code was not referring to the correct property for getting the employees to be deleted

    • It was always getting an empty list and hence no employee was being deleted

    • If employee has worked on assignments then employee is not deleted and a proper message is shown to the user
    • Added the logic to delete an employee and its dependent tables for employees who have never worked on an assignment
  • Fixed an issue where ProTrack would throw an error when entering an alpha character in the Pay Rate field
Daily Inquiry
  • Fixed an issue where the header of the Daily Inquiry screen was taking disapproved breaks into account in the Delay total
  • Fixed an issue where the Trip Audit Summary launched from the Daily Inquiry wasn't grouping determinants correctly
Kiosk
  • Fixed an issue where Undo button on the kiosk would physically delete an assignment
    • Changed the Undo logic to put the child assignment in DEL status instead of physically deleting it from the system
  • Fixed an issue where group assignments weren't working correctly in the kiosk
    • The code to update the assignment task start time after creating and starting a group assignment was incorrect
    • Corrected the call to updating the assignment task's start time
Active Performance Management
  • Fixed an issue where observations have a source value of NULL
    • Changed the default source of observations to "Manual" in the Create New Observation popup on the Observation monitor
  • Removed the Generate Observations screen
    • This removes the ability to generate bulk observations
Reports
  • Fixed an issue on Advanced Performance Management reports where the facility ID was being fetched from the wrong table
    • Facility ID field was removed from ap_observations
    • Changed the query to get facility ID from employee and not from ap_observations
  • Fixed issues with the Total D Performance By Activity Summary and Total D Trendline reports
    • Added the ability to query a range of dates
    • Added the ability to use on screen filters
    • Added the ability to open Summary or Detail

Bug Fixes

  • Fixed the issue of 1 hour discrepancy between the observations on the ProTrack version and the pdf version
  • Fixed the issue of break not accounted in the direct assignment
  • Fixed the issue of improper slotting of breaks
  • Fixed the issue of changing the status of an employee 
  • Fixed the APM reports to fetch facility id from employee and not from ap_observations
  • Fixed the slider issue for APM on iPad
  • Fixed the issue of disapproved delay not counted in calculating the delay time
  • Fixed the issue of deleting the child assignment 
  • Fixed the issue of deleting employees from ProTrack
  • Fixed the issue of source of observation having 'manual' as the default value
  • Fixed the issue of assigning employees to activities in Labor Plan
  • Fixed an issue in the trip audit summary report where it was not grouping determinants to give a total time spent in each determinant
  • Fixed the issue of grouped assignments not having a non adjusted standard time in the Daily Inquiry screen
  • Fixed the issue of Incentive Report not using the same date range as other reports
  • Fixed the Total D Performance By Activity Summary report to allow filtering by all the filter criteria
  • Fixed the Total D Performance By Activity Summary report to allow sub-total / total at "Facility,Activity" or "Facility, Activity, Employee"
  • Fixed the Total D Performance By Activity Summary report to allow a "To" date range to see a range of days
  • Fixed the issue of grouped assignments not having a non adjusted standard time in the Daily Inquiry screen
Patches

...

Section
Column
width800px
Anchor
2015.1.5
2015.1.5

ProTrack Warehouse 2015.1.5


 

Include Page
2015.1.5 Release Notes
2015.1.5 Release Notes

Anchor
2015.1.4
2015.1.4

ProTrack Warehouse 2015.1.4


 

Include Page
2015.1.4 Release Notes
2015.1.4 Release Notes

Anchor
2015.1.3
2015.1.3

ProTrack Warehouse 2015.1.3


 

Include Page
2015.1.3 Release Notes
2015.1.3 Release Notes

Anchor
2015.1.2
2015.1.2

ProTrack Warehouse 2015.1.2


 

Include Page
2015.1.2 Release Notes
2015.1.2 Release Notes

Anchor
2015.1.1
2015.1.1

ProTrack Warehouse 2015.1.1


 

Include Page
2015.1.1 Release Notes
2015.1.1 Release Notes

Anchor
2015.1.0
2015.1.0

ProTrack Warehouse 2015.1.0


 

Include Page
2015.1.0 Release Notes
2015.1.0 Release Notes

Column