Documentation for ProTrack Warehouse 7.5.
The Daily Inquiry in ProTrack Warehouse is a valuable tool for performing validation of work performed; educating employees on engineered standards, ensuring delays are credited to the proper function, and to check employees for performance issues.
The Daily Inquiry screen helps you to see the current performance of an employee. In addition to providing visibility of an employee's workday, this screen provides several additional features for approving, reshuffling, changing, adding or deleting work from the employee's past or present workday.
This section mentions the abbreviations that are present in the Daily Inquiry screen.
Abbreviation |
Expansion and Description |
---|---|
ADD |
Addition – An assignment pending reshuffle. |
CAL |
Calculating – Standard calculation for an assignment is currently processing. |
COM |
Completed – An assignment that was completed by an employee and has been fully processed. |
ERR |
Error – An assignment that was completed by an employee but could not be slotted into the work schedule. |
GRP |
Group – Multiple pre-downloaded assignments worked simultaneously. ProTrackWarehouse groups them together as a single work assignment. |
HLD |
Hold – Assignment is placed on hold. |
KVI |
Key Volume Indicator – An assignment waiting for KVI values to be entered. Example of KVI is number of pallets or number of cases. |
To access the Daily Inquiry screen: